{
 "pcon24cd": "E14001307",
 "name": "Jarrow and Gateshead East",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 5.0,
  "stuck_mw_int": 5,
  "stuck_sites": 3,
  "homes_equivalent": 1800,
  "homes_vs_seat_households": 0.04,
  "stuck_mw_12m_cut": 5.8,
  "consented_not_built_mw_any_age": 6.4,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.4,
  "rank": 263,
  "tech_mix": {
   "solar": 5.0
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "NCL1, Follingsby Lane - Solar Panels",
    "repd_ref_id": 13317,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 3.9,
    "homes_equivalent": 1400,
    "consented": "2023-04-20",
    "months_waiting": 39.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Neilson Road - Solar Photovoltaic Array",
    "repd_ref_id": 9829,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.9,
    "homes_equivalent": 300,
    "consented": "2021-12-10",
    "months_waiting": 55.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Clarendon, Windmill Way - Solar Panels",
    "repd_ref_id": 19654,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2025-10-24",
    "months_waiting": 9.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Simonside Industrial Unit, Shaftesbury Avenue - Solar Panels",
    "repd_ref_id": 17177,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2024-10-08",
    "months_waiting": 21.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hebburn Lakes Primary School, Campbell Park Road - Solar PV Panels",
    "repd_ref_id": 19744,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-11-24",
    "months_waiting": 8.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Robert Duncan Timber Limited, Green Lane - Solar Panels",
    "repd_ref_id": 12933,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-01-18",
    "months_waiting": 42.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Donwood Double Glazing, Stonehills Buildings - Unit A23 - Solar Panels",
    "repd_ref_id": 18075,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-03-07",
    "months_waiting": 16.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Big Yellow Self Storage - Solar Panels",
    "repd_ref_id": 18761,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-06-18",
    "months_waiting": 13.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "UTS Engineering, Pilgrimsway - Solar Panels",
    "repd_ref_id": 19695,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-10-22",
    "months_waiting": 9.4,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 42695,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 35.0,
  "building_mw": 0.0,
  "approved_mw": 60.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 100.0,
  "sites": [
   {
    "site_name": "Church Bank - Battery Storage System",
    "capacity_mw": 100.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "West Boldon Substation - Battery Energy Storage",
    "capacity_mw": 60.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 210000
   },
   {
    "site_name": "Port of Tyne",
    "capacity_mw": 35.0,
    "status": "operating",
    "year": null,
    "homes_while_discharging": 123000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Church Bank - Battery Storage System",
   "repd_ref_id": 18066,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "South Tyneside",
   "planning_ref": "250408",
   "operator": "AMG Energy",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "South Tyneside Council",
    "evidence": {
     "submitted": "2025-09-05",
     "months_waiting": 11
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "West Boldon Substation - Battery Energy Storage",
   "repd_ref_id": 14408,
   "technology": "Battery",
   "capacity_mw": 60.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-12-10",
   "refused": "2024-06-21",
   "planning_authority": "South Tyneside",
   "planning_ref": "ST/0486/23/FUL",
   "operator": "Whirlwind Energy Storage Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-12-10",
     "years_since_consent": 1.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "NCL1, Follingsby Lane - Solar Panels",
   "repd_ref_id": 13317,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 3.9,
   "homes_equivalent": 1400,
   "status": "Awaiting Construction",
   "consented": "2023-04-20",
   "refused": null,
   "planning_authority": "Gateshead",
   "planning_ref": "DC/23/00115/FUL",
   "operator": "Zestec Asset Management",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-04-20",
     "years_since_consent": 3.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001567",
  "E14001244",
  "E14001492"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}