 "pcon24cd": "E14001253",
 "name": "Grantham and Bourne",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 151.3,
  "stuck_mw_int": 151,
  "stuck_sites": 10,
  "homes_equivalent": 55000,
  "homes_vs_seat_households": 1.27,
  "stuck_mw_12m_cut": 791.7,
  "consented_not_built_mw_any_age": 842.1,
  "operational_mw": 119.5,
  "operational_homes_equivalent": 43000,
  "refused_5y_mw": 38.8,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 3.1,
  "rank": 32,
  "tech_mix": {
   "solar": 151.3
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 1.3,
  "projects": [
   {
    "site_name": "Heckington Fen Solar Park",
    "repd_ref_id": 9806,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 500.0,
    "homes_equivalent": 182000,
    "consented": "2025-01-24",
    "months_waiting": 18.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Bypass Solar Farm",
    "repd_ref_id": 9050,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2021-03-01",
    "months_waiting": 65.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Little Hale Fen - Solar Farm",
    "repd_ref_id": 9586,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2025-08-13",
    "months_waiting": 11.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ash Tree Solar Farm & Battery Storage",
    "repd_ref_id": 15396,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2025-07-18",
    "months_waiting": 12.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Welby Solar Farm, Welby - Solar Farm",
    "repd_ref_id": 15193,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 46.0,
    "homes_equivalent": 17000,
    "consented": "2025-02-10",
    "months_waiting": 17.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Washdyke Farm, Billingborough Road - Solar farm",
    "repd_ref_id": 12419,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 27.0,
    "homes_equivalent": 9800,
    "consented": "2024-04-23",
    "months_waiting": 27.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "White Cross Lane",
    "repd_ref_id": 6530,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 25.0,
    "homes_equivalent": 9100,
    "consented": "2019-12-31",
    "months_waiting": 79.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Side Barn, Church Lane - Solar Farm",
    "repd_ref_id": 13592,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 24.0,
    "homes_equivalent": 8700,
    "consented": "2025-01-15",
    "months_waiting": 18.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Green Lane & Cliff Lane, Gonerby Moor - Solar Farm",
    "repd_ref_id": 19165,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 23.0,
    "homes_equivalent": 8300,
    "consented": "2024-01-22",
    "months_waiting": 30.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Limes Farm Solar Farm & Battery Energy Storage",
    "repd_ref_id": 11796,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 20.0,
    "homes_equivalent": 7300,
    "consented": "2025-05-12",
    "months_waiting": 14.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Gorse Lane",
    "repd_ref_id": 6701,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 20.0,
    "homes_equivalent": 7300,
    "consented": "2019-03-29",
    "months_waiting": 88.2,
    "status": "Under Construction"
   },
   {
    "site_name": "New Earth Solutions West, High Dike - Solar Panels & Battery Srorage",
    "repd_ref_id": 12732,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 4.8,
    "homes_equivalent": 1700,
    "consented": "2023-01-31",
    "months_waiting": 42.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mid UK Recycling, Caythorpe Heath Lane -  Solar Photovoltaic Panels",
    "repd_ref_id": 12585,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2022-12-14",
    "months_waiting": 43.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "MV Fruehauf Limited, Houghton Road - Solar Panels",
    "repd_ref_id": 18462,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2025-05-02",
    "months_waiting": 15.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hangar, Roseland Business Park - Solar panels",
    "repd_ref_id": 20636,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2026-04-28",
    "months_waiting": 3.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Walton Girls School, Kitty Briggs Lane - Solar Panels",
    "repd_ref_id": 19359,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-09-19",
    "months_waiting": 10.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "BGB Engineering Limited - Solar Panels Scheme",
    "repd_ref_id": 11489,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-07-20",
    "months_waiting": 48.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Belton Garden Centre, Grantham Road - Solar Arrays",
    "repd_ref_id": 13631,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-06-07",
    "months_waiting": 37.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kellington House, South Fen Road - Solar Panels",
    "repd_ref_id": 13196,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2023-03-22",
    "months_waiting": 40.4,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 43089,
  "seat_total_gbp": 4000000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 174.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 1000.0,
  "sites": [
   {
    "site_name": "Canners Lane Energy Park, High Dike - Battery Energy Storage",
    "capacity_mw": 1000.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 3504000
   },
   {
    "site_name": "Little Hale Drove, Little Hale Fen - Battery Storage",
    "capacity_mw": 99.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 347000
   },
   {
    "site_name": "Little Hale Fen - Solar Farm",
    "capacity_mw": 50.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Ash Tree Solar Farm & Battery Storage",
    "capacity_mw": 25.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 88000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Canners Lane Energy Park, High Dike - Battery Energy Storage",
   "repd_ref_id": 18652,
   "technology": "Battery",
   "capacity_mw": 1000.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "S25/1534",
   "operator": "NatPower UK",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "North Kesteven Council",
    "evidence": {
     "submitted": "2025-09-23",
     "months_waiting": 10
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Heckington Fen Solar Park",
   "repd_ref_id": 9806,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 500.0,
   "homes_equivalent": 182000,
   "status": "Awaiting Construction",
   "consented": "2025-01-24",
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010123",
   "operator": "Ecotricity Limited",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2028, 3 years after it was approved",
    "who": "the grid operator (NESO) and National Grid",
    "evidence": {
     "project": "Heckington Fen Solar Park",
     "connection_date": "2028-10-01",
     "mw": 400.0,
     "stage": null,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2028",
   "tec": {
    "project": "Heckington Fen Solar Park",
    "connection_date": "2028-10-01",
    "connection_year": 2028,
    "mw": 400.0,
    "stage": null,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Little Hale Drove, Little Hale Fen - Battery Storage",
   "repd_ref_id": 17585,
   "technology": "Battery",
   "capacity_mw": 99.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-03-14",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "24/1265/FUL",
   "operator": "Root-Power (South) Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-03-14",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Little Hale Fen - Solar Farm",
   "repd_ref_id": 14955,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-08-13",
   "refused": "2024-11-07",
   "planning_authority": "North Kesteven",
   "planning_ref": "23/1021/FUL",
   "operator": "AGR Solar 2 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-13",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bypass Solar Farm",
   "repd_ref_id": 9050,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2021-03-01",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S20/1433",
   "operator": "By-Pass Farm Solar Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-03-01",
     "years_since_consent": 5.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Little Hale Fen - Solar Farm",
   "repd_ref_id": 9586,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2025-08-13",
   "refused": "2024-11-07",
   "planning_authority": "North Kesteven",
   "planning_ref": "23/1021/FUL",
   "operator": "AGR Solar 2 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-13",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Ash Tree Solar Farm & Battery Storage",
   "repd_ref_id": 15396,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2025-07-18",
   "refused": "2024-10-25",
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/2199",
   "operator": "Low Carbon Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-18",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Welby Solar Farm, Welby - Solar Farm",
   "repd_ref_id": 15193,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 46.0,
   "homes_equivalent": 17000,
   "status": "Awaiting Construction",
   "consented": "2025-02-10",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S24/1040",
   "operator": "Island Green Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-10",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Burton Gorse Plantation, Whitecross Lane - Solar Panels",
   "repd_ref_id": 17363,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 42.0,
   "homes_equivalent": 15000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "24/1470/FUL",
   "operator": "Starlight Energy",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 16 months for a planning decision",
    "who": "North Kesteven Council",
    "evidence": {
     "submitted": "2025-03-26",
     "months_waiting": 16
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Glebe Farm Solar Farm",
   "repd_ref_id": 19213,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 38.8,
   "homes_equivalent": 14000,
   "status": "Application Refused",
   "consented": null,
   "refused": "2025-10-14",
   "planning_authority": "South Kesteven",
   "planning_ref": "S25/1194",
   "operator": "Stark Energy Limited",
   "reason": {
    "reason": "refused",
    "label": "Refused by South Kesteven Council in 2025",
    "who": "South Kesteven Council",
    "evidence": {
     "refusal_date": "2025-10-14"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Washdyke Farm, Billingborough Road - Solar farm",
   "repd_ref_id": 12419,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 27.0,
   "homes_equivalent": 9800,
   "status": "Awaiting Construction",
   "consented": "2024-04-23",
   "refused": "2024-04-23",
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/0511",
   "operator": "GS Ignis Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-04-23",
     "years_since_consent": 2.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Ash Tree Solar Farm & Battery Storage",
   "repd_ref_id": 15397,
   "technology": "Battery",
   "capacity_mw": 25.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-18",
   "refused": "2024-10-25",
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/2199",
   "operator": "Low Carbon Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-18",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "White Cross Lane",
   "repd_ref_id": 6530,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 25.0,
   "homes_equivalent": 9100,
   "status": "Under Construction",
   "consented": "2019-12-31",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "19/0863/FUL",
   "operator": "Nextpower SPV 5 Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Side Barn, Church Lane - Solar Farm",
   "repd_ref_id": 13592,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 24.0,
   "homes_equivalent": 8700,
   "status": "Awaiting Construction",
   "consented": "2025-01-15",
   "refused": "2024-07-25",
   "planning_authority": "South Kesteven",
   "planning_ref": "S24/0360",
   "operator": "PS Renewables Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-01-15",
     "years_since_consent": 1.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Green Lane & Cliff Lane, Gonerby Moor - Solar Farm",
   "repd_ref_id": 19165,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 23.0,
   "homes_equivalent": 8300,
   "status": "Awaiting Construction",
   "consented": "2024-01-22",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S23/1934",
   "operator": "Lightsource BP",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-01-22",
     "years_since_consent": 2.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Gorse Lane",
   "repd_ref_id": 6701,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Under Construction",
   "consented": "2019-03-29",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "19/0060/FUL",
   "operator": "Elgin Energy Esco",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Limes Farm Solar Farm & Battery Energy Storage",
   "repd_ref_id": 11796,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Awaiting Construction",
   "consented": "2025-05-12",
   "refused": null,
   "planning_authority": "South Kesteven",
   "planning_ref": "S24/2191",
   "operator": "Downing Limited Liability Partnership",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-05-12",
     "years_since_consent": 1.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "New Earth Solutions West, High Dike - Solar Panels & Battery Srorage",
   "repd_ref_id": 12732,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 4.8,
   "homes_equivalent": 1700,
   "status": "Awaiting Construction",
   "consented": "2023-01-31",
   "refused": null,
   "planning_authority": "North Kesteven",
   "planning_ref": "PL/0123/22",
   "operator": "New Earth Solutions (West) Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-31",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001487",
  "E14001458",
  "E14001476",
  "E14001114",
  "E14001357",
  "E14001375"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}