 "pcon24cd": "E14001250",
 "name": "Goole and Pocklington",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 139.5,
   "sites": 10
  }
 },
 "number2": {
  "stuck_mw": 62.7,
  "stuck_mw_int": 63,
  "stuck_sites": 11,
  "homes_equivalent": 27000,
  "homes_vs_seat_households": 0.6,
  "stuck_mw_12m_cut": 471.5,
  "consented_not_built_mw_any_age": 474.8,
  "operational_mw": 149.5,
  "operational_homes_equivalent": 126000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 4.7,
  "median_months_to_decision": 1.8,
  "rank": 107,
  "tech_mix": {
   "solar": 55.3,
   "onshore wind": 7.4
  },
  "tech_summary": "almost all solar",
  "waiting_vs_running": 0.4,
  "projects": [
   {
    "site_name": "East Yorkshire Solar Farm",
    "repd_ref_id": 11678,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 400.0,
    "homes_equivalent": 145000,
    "consented": "2025-05-09",
    "months_waiting": 14.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Soay Solar Farm and Greener Grid Park",
    "repd_ref_id": 9014,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 50.0,
    "homes_equivalent": 18000,
    "consented": "2022-11-28",
    "months_waiting": 44.2,
    "status": "Under Construction"
   },
   {
    "site_name": "Rawcliffe Estate, Bridge Lane - Solar Farm",
    "repd_ref_id": 17031,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 6.0,
    "homes_equivalent": 2200,
    "consented": "2024-12-06",
    "months_waiting": 19.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Melton - Wind Turbines",
    "repd_ref_id": 11350,
    "technology": "Wind Onshore",
    "capacity_mw": 3.0,
    "homes_equivalent": 2600,
    "consented": "2024-02-12",
    "months_waiting": 29.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Howdens Joinery, Thorpe Road - Solar Panels",
    "repd_ref_id": 15817,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 3.0,
    "homes_equivalent": 1100,
    "consented": "2024-03-06",
    "months_waiting": 28.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Melton Common Wind Cluster",
    "repd_ref_id": 14746,
    "technology": "Wind Onshore",
    "capacity_mw": 2.3,
    "homes_equivalent": 2000,
    "consented": "2016-02-05",
    "months_waiting": 125.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Gallymoor Landfill Site",
    "repd_ref_id": 3767,
    "technology": "Wind Onshore",
    "capacity_mw": 1.8,
    "homes_equivalent": 1600,
    "consented": "2012-07-10",
    "months_waiting": 168.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Bayram Timber Limited, Gibson Lane South - Solar Panels",
    "repd_ref_id": 20479,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.7,
    "homes_equivalent": 600,
    "consented": "2026-04-08",
    "months_waiting": 3.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Yorkshire Grown Produce, Main Road - Solar Panels",
    "repd_ref_id": 15593,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.5,
    "homes_equivalent": 500,
    "consented": "2024-02-22",
    "months_waiting": 29.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Newton Farm, Tongue Lane -  Solar Farm & Battery Storage",
    "repd_ref_id": 17946,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.5,
    "homes_equivalent": 500,
    "consented": "2025-06-11",
    "months_waiting": 13.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Tesco Distribution Centre. Tom Pudding Way - Solar PV Array",
    "repd_ref_id": 18922,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.6,
    "homes_equivalent": 200,
    "consented": "2025-07-17",
    "months_waiting": 12.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Grove Farm, Main Street - Wind Turbines",
    "repd_ref_id": 18659,
    "technology": "Wind Onshore",
    "capacity_mw": 0.5,
    "homes_equivalent": 400,
    "consented": "2025-10-09",
    "months_waiting": 9.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Victory Conversions, Sandholme Business Park - Solar Panels",
    "repd_ref_id": 16842,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2024-09-13",
    "months_waiting": 22.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Commons Farm, Thorne Road - Solar Panels",
    "repd_ref_id": 14092,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2023-07-27",
    "months_waiting": 36.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Braffords Farm, Riplingham Road - Wind Turbine",
    "repd_ref_id": 15654,
    "technology": "Wind Onshore",
    "capacity_mw": 0.3,
    "homes_equivalent": 300,
    "consented": "2024-07-11",
    "months_waiting": 24.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "St Helens Farm, Reangamoor Lane - Solar Panels",
    "repd_ref_id": 18851,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-07-11",
    "months_waiting": 12.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Ryedale Farm, Seaton Common Lane - Solar Panels",
    "repd_ref_id": 19208,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-08-18",
    "months_waiting": 11.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Croda Europe, Tom Pudding Way - Solar Panels",
    "repd_ref_id": 14264,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-10-23",
    "months_waiting": 33.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Greenlands Farm, Barmby Moor - Solar Photovoltaic Arrays",
    "repd_ref_id": 19488,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-10-13",
    "months_waiting": 9.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Melton Enterprise Park, Redcliff Road - Solar Panels",
    "repd_ref_id": 20183,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2026-02-06",
    "months_waiting": 5.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Weighton Road, Sancton - Wind Turbine",
    "repd_ref_id": 19994,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2025-12-18",
    "months_waiting": 7.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Oaks Golf Club - Solar Panels",
    "repd_ref_id": 10526,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-11-30",
    "months_waiting": 44.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Greenland Hall Farm \u2013 Ground Mounted Solar Panels",
    "repd_ref_id": 14392,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2023-07-14",
    "months_waiting": 36.7,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 44355,
  "seat_total_gbp": 4100000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 148.9,
  "building_mw": 200.0,
  "approved_mw": 900.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 10.0,
  "sites": [
   {
    "site_name": "Thornton Battery Storage",
    "capacity_mw": 400.0,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Ryedale Farm, Seaton Common Lane - Battery Energy Storage",
    "capacity_mw": 300.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1051000
   },
   {
    "site_name": "Soay Solar Farm and Greener Grid Park",
    "capacity_mw": 200.0,
    "status": "building",
    "year": 2022,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Tara Melbourne Road, Thornton - Battery Energy Storage Facility",
    "capacity_mw": 200.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Creyke Beck",
    "capacity_mw": 49.9,
    "status": "operating",
    "year": 2017,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Pillswood Phase 1",
    "capacity_mw": 49.5,
    "status": "operating",
    "year": 2018,
    "homes_while_discharging": 173000
   },
   {
    "site_name": "Pillswood Phase 2",
    "capacity_mw": 49.5,
    "status": "operating",
    "year": 2023,
    "homes_while_discharging": 173000
   },
   {
    "site_name": "Market Weighton Road, Barlby - Solar Farm & Battery Storage",
    "capacity_mw": 10.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 35000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Thornton Battery Storage",
   "repd_ref_id": 19288,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-02-27",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "25/01685/STPLF",
   "operator": "Greenfield Energy Developments Limited",
   "reason": {
    "reason": "gate2",
    "label": "Still in the grid queue review \u2014 no firm connection date yet",
    "who": "the grid operator (NESO)",
    "evidence": {
     "project": "Thornton BESS",
     "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet"
    },
    "all_matches": [
     "gate2",
     "connection_date",
     "consented_no_activity"
    ]
   },
   "earliest": "2035",
   "tec": {
    "project": "Thornton BESS",
    "connection_date": "2035-10-30",
    "connection_year": 2035,
    "mw": 200.0,
    "stage": null,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": "Still in the grid queue review \u2014 no firm connection date yet",
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "East Yorkshire Solar Farm",
   "repd_ref_id": 11678,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 400.0,
   "homes_equivalent": 145000,
   "status": "Awaiting Construction",
   "consented": "2025-05-09",
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010143",
   "operator": "Boom Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-05-09",
     "years_since_consent": 1.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Ryedale Farm, Seaton Common Lane - Battery Energy Storage",
   "repd_ref_id": 19251,
   "technology": "Battery",
   "capacity_mw": 300.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-12-12",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "25/01321/STPLF",
   "operator": "RPC Elmya Carnation Foxdale Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-12-12",
     "years_since_consent": 0.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Tara Melbourne Road, Thornton - Battery Energy Storage Facility",
   "repd_ref_id": 18852,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-08-28",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "25/00852/STPLF",
   "operator": "Rewe 9 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-28",
     "years_since_consent": 0.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Soay Solar Farm and Greener Grid Park",
   "repd_ref_id": 10586,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2022-11-28",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "21/04505/STPLF",
   "operator": "Statkraft Uk Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Soay Solar Farm and Greener Grid Park",
   "repd_ref_id": 9014,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 50.0,
   "homes_equivalent": 18000,
   "status": "Under Construction",
   "consented": "2022-11-28",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "21/04505/STPLF",
   "operator": "Statkraft Uk Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Market Weighton Road, Barlby - Solar Farm & Battery Storage",
   "repd_ref_id": 17893,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 30.0,
   "homes_equivalent": 11000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "ZG2024/1323/SCN",
   "operator": "Quintas Cleantech",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "North Yorkshire Council",
    "evidence": {
     "submitted": "2025-07-31",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Melton Waste Park",
   "repd_ref_id": 6617,
   "technology": "EfW Incineration",
   "capacity_mw": 22.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2019-02-28",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "18/00703/CM",
   "operator": "Transwaste Recycling & Aggregates Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-02-28",
     "years_since_consent": 7.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Market Weighton Road, Barlby - Solar Farm & Battery Storage",
   "repd_ref_id": 17894,
   "technology": "Battery",
   "capacity_mw": 10.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Yorkshire",
   "planning_ref": "ZG2024/1323/SCN",
   "operator": "Quintas Cleantech",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 12 months for a planning decision",
    "who": "North Yorkshire Council",
    "evidence": {
     "submitted": "2025-07-31",
     "months_waiting": 12
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Rawcliffe Estate, Bridge Lane - Solar Farm",
   "repd_ref_id": 17031,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 6.0,
   "homes_equivalent": 2200,
   "status": "Awaiting Construction",
   "consented": "2024-12-06",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/01628/REG3",
   "operator": "East Riding of Yorkshire Council (Goole Division)",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-12-06",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Yorkshire Botanicals - Biomass Boiler",
   "repd_ref_id": 12232,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 5.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-11-15",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/02745/PLF",
   "operator": "Yorkshire Botanicals Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-11-15",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Melton Common Wind Cluster",
   "repd_ref_id": 14745,
   "technology": "Wind Onshore",
   "capacity_mw": 4.6,
   "homes_equivalent": 4000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "23/01982/STPLFE",
   "operator": "Melton Wind Limited",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 3.0 years for a planning decision",
    "who": "East Riding of Yorkshire Council",
    "evidence": {
     "submitted": "2023-08-17",
     "months_waiting": 36
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Yorkshire Grown Produce, Main Road - Biomass Boiler",
   "repd_ref_id": 12355,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 4.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-11-21",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/03183/PLF",
   "operator": "Yorkshire Grown Produce Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-11-21",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Melton - Wind Turbines",
   "repd_ref_id": 11350,
   "technology": "Wind Onshore",
   "capacity_mw": 3.0,
   "homes_equivalent": 2600,
   "status": "Awaiting Construction",
   "consented": "2024-02-12",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/01302/CME",
   "operator": "Omya UK Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-02-12",
     "years_since_consent": 2.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Howdens Joinery, Thorpe Road - Solar Panels",
   "repd_ref_id": 15817,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 3.0,
   "homes_equivalent": 1100,
   "status": "Awaiting Construction",
   "consented": "2024-03-06",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/00216/PVNOT",
   "operator": "Howden Joinery Properties Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-03-06",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Melton Common Wind Cluster",
   "repd_ref_id": 14746,
   "technology": "Wind Onshore",
   "capacity_mw": 2.3,
   "homes_equivalent": 2000,
   "status": "Awaiting Construction",
   "consented": "2016-02-05",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "14/01499/STPLFE",
   "operator": "Melton Wind Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 10 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2016-02-05",
     "years_since_consent": 10.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Gallymoor Landfill Site",
   "repd_ref_id": 3767,
   "technology": "Wind Onshore",
   "capacity_mw": 1.8,
   "homes_equivalent": 1600,
   "status": "Awaiting Construction",
   "consented": "2012-07-10",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "11/00537/STPLF",
   "operator": "FCC Environment",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 14 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2012-07-10",
     "years_since_consent": 14.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bayram Timber Limited, Gibson Lane South - Solar Panels",
   "repd_ref_id": 20479,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.7,
   "homes_equivalent": 600,
   "status": "Awaiting Construction",
   "consented": "2026-04-08",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "26/00355/PVNOT",
   "operator": "Footprint Zero",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-04-08",
     "years_since_consent": 0.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Newton Farm, Tongue Lane -  Solar Farm & Battery Storage",
   "repd_ref_id": 17946,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.5,
   "homes_equivalent": 500,
   "status": "Awaiting Construction",
   "consented": "2025-06-11",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/02946/PLF",
   "operator": "Newstead Farm",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-06-11",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Yorkshire Grown Produce, Main Road - Solar Panels",
   "repd_ref_id": 15593,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.5,
   "homes_equivalent": 500,
   "status": "Awaiting Construction",
   "consented": "2024-02-22",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/00009/PVNOT",
   "operator": "Yorkshire Grown Produce Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-02-22",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001315",
  "E14001087",
  "E14001314",
  "E14001127",
  "E14001199",
  "E14001200",
  "E14001464",
  "E14001605",
  "E14001544"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}