 "pcon24cd": "E14001232",
 "name": "Exmouth and Exeter East",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 150.3,
  "stuck_mw_int": 150,
  "stuck_sites": 11,
  "homes_equivalent": 55000,
  "homes_vs_seat_households": 1.28,
  "stuck_mw_12m_cut": 152.6,
  "consented_not_built_mw_any_age": 169.8,
  "operational_mw": 50.2,
  "operational_homes_equivalent": 18000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 3.6,
  "rank": 34,
  "tech_mix": {
   "solar": 150.3
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 3.0,
  "projects": [
   {
    "site_name": "Rutton Farm, Whimple - Horton Solar Farm",
    "repd_ref_id": 11274,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2023-06-16",
    "months_waiting": 37.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Paytherden Solar Farm (Peradon)",
    "repd_ref_id": 11756,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.0,
    "homes_equivalent": 18000,
    "consented": "2022-12-07",
    "months_waiting": 43.9,
    "status": "Under Construction"
   },
   {
    "site_name": "Ford Oaks Solar & Green Infrastructure Facility",
    "repd_ref_id": 11366,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 30.0,
    "homes_equivalent": 11000,
    "consented": "2023-11-30",
    "months_waiting": 32.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Higher Hawkerland Farm, Sidmouth Road - Solar Farm",
    "repd_ref_id": 12578,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 18.0,
    "homes_equivalent": 6500,
    "consented": "2023-04-28",
    "months_waiting": 39.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kerswell Barton Farm, Broadclyst - Solar Panels",
    "repd_ref_id": 18518,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 16.2,
    "homes_equivalent": 5900,
    "consented": "2025-08-07",
    "months_waiting": 11.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Winslade Park - Solar Array",
    "repd_ref_id": 15800,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.9,
    "homes_equivalent": 700,
    "consented": "2025-02-24",
    "months_waiting": 17.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Westexe, Greendale Business Park - Solar Panels",
    "repd_ref_id": 15592,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.1,
    "homes_equivalent": 400,
    "consented": "2024-02-14",
    "months_waiting": 29.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Crealy Adventure Park, Clyst St Mary - Solar Array",
    "repd_ref_id": 11848,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.9,
    "homes_equivalent": 300,
    "consented": "2022-09-27",
    "months_waiting": 46.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Devon Cliffs Holiday Centre, Sandy Bay  - Solar panels",
    "repd_ref_id": 13244,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2023-03-24",
    "months_waiting": 40.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Emperor House, Grenadier Road - Solar Panels & Car Park Replacement",
    "repd_ref_id": 15742,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2025-08-29",
    "months_waiting": 11.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Skypark, Spitfire Avenue -  Solar Panels",
    "repd_ref_id": 20779,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2026-05-08",
    "months_waiting": 2.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Howmet, Kestrel Way - Solar Photovoltaic Panels",
    "repd_ref_id": 11840,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2025-05-21",
    "months_waiting": 14.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "David Lloyd Leisure Club, Sandy Park Way - Solar Panels",
    "repd_ref_id": 14556,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2023-09-28",
    "months_waiting": 34.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Darts Farm Shopping Village, Clyst St George - Solar Panels",
    "repd_ref_id": 13214,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2023-03-10",
    "months_waiting": 40.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "William Pollard & Co, Oak House - Solar Panels",
    "repd_ref_id": 11949,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-09-07",
    "months_waiting": 46.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Vapormatic Company - Solar Panels",
    "repd_ref_id": 13971,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2023-06-20",
    "months_waiting": 37.5,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 42783,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 633.4,
  "approved_24m_mw": 350.0,
  "refused_mw": 0.0,
  "submitted_mw": 50.2,
  "sites": [
   {
    "site_name": "Saundercroft Farm - Battery Energy Storage System",
    "capacity_mw": 290.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 1016000
   },
   {
    "site_name": "Exeter Substation, Broadclyst - Battery Energy Storage",
    "capacity_mw": 125.0,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 438000
   },
   {
    "site_name": "National Grid Substation - Battery Energy Storage System",
    "capacity_mw": 100.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 350000
   },
   {
    "site_name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility",
    "capacity_mw": 60.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 210000
   },
   {
    "site_name": "Saundercroft Road, Broadclyst - Battery Energy Storage System",
    "capacity_mw": 57.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 200000
   },
   {
    "site_name": "Higher Bagmore Farm, Ebford Lane -Battery Energy Storage System",
    "capacity_mw": 50.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 175000
   },
   {
    "site_name": "Electricity Sub Station, Tithebarn Way - Battery Energy Storage Facility",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Hill Barton Business Park, Clyst St Mary - Battery Energy Storage",
    "capacity_mw": 0.2,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Bittern Road - Energy Storage Facility",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Wares Farm, Clyst Honiton - Micro Energy Storage Facility",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Blackhorse Lane - Micro Energy Storage",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 700
   },
   {
    "site_name": "Blackhorse Lane, Clyst Honiton - Energy Storage Facility",
    "capacity_mw": 0.2,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Saundercroft Farm - Battery Energy Storage System",
   "repd_ref_id": 13980,
   "technology": "Battery",
   "capacity_mw": 290.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-01-12",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "23/0962/MFUL",
   "operator": "Exeter Storage Limited (Statera Energy)",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-01-12",
     "years_since_consent": 2.6
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Exeter Substation, Broadclyst - Battery Energy Storage",
   "repd_ref_id": 17747,
   "technology": "Battery",
   "capacity_mw": 125.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-05-20",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "25/1150/MFUL",
   "operator": "Island Green Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-05-20",
     "years_since_consent": 0.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "National Grid Substation - Battery Energy Storage System",
   "repd_ref_id": 17484,
   "technology": "Battery",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-08-22",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "25/0063/MFUL",
   "operator": "Penso Power (BW ESS)",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-22",
     "years_since_consent": 0.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility",
   "repd_ref_id": 12815,
   "technology": "Battery",
   "capacity_mw": 60.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-07-13",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "22/2546/MFUL",
   "operator": "Clinton Devon Estates",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-07-13",
     "years_since_consent": 3.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Saundercroft Road, Broadclyst - Battery Energy Storage System",
   "repd_ref_id": 18044,
   "technology": "Battery",
   "capacity_mw": 57.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-18",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "24/2664/MFUL",
   "operator": "Pivoted Power Llp",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-18",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Higher Bagmore Farm, Ebford Lane -Battery Energy Storage System",
   "repd_ref_id": 19391,
   "technology": "Battery",
   "capacity_mw": 50.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "25/1338/MFUL",
   "operator": "Enviromena",
   "reason": {
    "reason": "planning_overdue",
    "label": "Waiting 13 months for a planning decision",
    "who": "East Devon Council",
    "evidence": {
     "submitted": "2025-07-08",
     "months_waiting": 13
    },
    "all_matches": [
     "planning_overdue"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Rutton Farm, Whimple - Horton Solar Farm",
   "repd_ref_id": 11274,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2023-06-16",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "22/0783/MFUL",
   "operator": "Aura Power Developments Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-06-16",
     "years_since_consent": 3.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Paytherden Solar Farm (Peradon)",
   "repd_ref_id": 11756,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.0,
   "homes_equivalent": 18000,
   "status": "Under Construction",
   "consented": "2022-12-07",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "21/3120/MFUL",
   "operator": "Lightrock Power Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Ford Oaks Solar & Green Infrastructure Facility",
   "repd_ref_id": 11366,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 30.0,
   "homes_equivalent": 11000,
   "status": "Under Construction",
   "consented": "2023-11-30",
   "refused": "2023-01-12",
   "planning_authority": "East Devon",
   "planning_ref": "22/0990/MFUL",
   "operator": "Low Carbon Alliance / Taiyo Power & Storage",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Higher Hawkerland Farm, Sidmouth Road - Solar Farm",
   "repd_ref_id": 12578,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 18.0,
   "homes_equivalent": 6500,
   "status": "Awaiting Construction",
   "consented": "2023-04-28",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "22/2409/MFUL",
   "operator": "Spring Dev 09 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-04-28",
     "years_since_consent": 3.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kerswell Barton Farm, Broadclyst - Solar Panels",
   "repd_ref_id": 18518,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 16.2,
   "homes_equivalent": 5900,
   "status": "Awaiting Construction",
   "consented": "2025-08-07",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "25/0467/MFUL",
   "operator": "MJ Quinn Integrated Services Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-08-07",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Winslade Park - Solar Array",
   "repd_ref_id": 15800,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.9,
   "homes_equivalent": 700,
   "status": "Awaiting Construction",
   "consented": "2025-02-24",
   "refused": "2024-05-30",
   "planning_authority": "East Devon",
   "planning_ref": "23/2506/MFUL",
   "operator": "Burrington Estates (New Homes Thrive Hubs)",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-02-24",
     "years_since_consent": 1.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Westexe, Greendale Business Park - Solar Panels",
   "repd_ref_id": 15592,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.1,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2024-02-14",
   "refused": null,
   "planning_authority": "East Devon",
   "planning_ref": "23/2707/PVJ",
   "operator": "Olympus Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-02-14",
     "years_since_consent": 2.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001231",
  "E14001291",
  "E14001155"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}