 "pcon24cd": "E14001221",
 "name": "Edmonton and Winchmore Hill",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 1.2,
  "stuck_mw_int": 1,
  "stuck_sites": 4,
  "homes_equivalent": 400,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 1.4,
  "consented_not_built_mw_any_age": 1.4,
  "operational_mw": 0.2,
  "operational_homes_equivalent": 100,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.8,
  "rank": 398,
  "tech_mix": {
   "solar": 1.2
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Edmonton County School, Great Cambridge Road - Solar Panels",
    "repd_ref_id": 15353,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-01-18",
    "months_waiting": 30.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Eley Road - Solar panels",
    "repd_ref_id": 11099,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2022-06-06",
    "months_waiting": 49.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Workstown Industrial Estate, Princes Road -  Solar Panels",
    "repd_ref_id": 14189,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-08-18",
    "months_waiting": 35.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Edmonton lower school - Solar Panels",
    "repd_ref_id": 15720,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-03-18",
    "months_waiting": 28.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sainsburys Supermarkets, Green Lanes - Solar Panels",
    "repd_ref_id": 18284,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-04-09",
    "months_waiting": 15.8,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 45393,
  "seat_total_gbp": 4200000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "North London Heat and Power (Edmonton EcoPark Replacement)",
   "repd_ref_id": 4923,
   "technology": "EfW Incineration",
   "capacity_mw": 70.0,
   "homes_equivalent": null,
   "status": "Under Construction",
   "consented": "2017-02-24",
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010071",
   "operator": "North London Waste Authority (NLWA)",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001553",
  "E14001563",
  "E14001167",
  "E14001503",
  "E14001225"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}