 "pcon24cd": "E14001199",
 "name": "Doncaster East and the Isle of Axholme",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 140.7,
   "sites": 3
  }
 },
 "number2": {
  "stuck_mw": 83.4,
  "stuck_mw_int": 83,
  "stuck_sites": 4,
  "homes_equivalent": 30000,
  "homes_vs_seat_households": 0.77,
  "stuck_mw_12m_cut": 83.4,
  "consented_not_built_mw_any_age": 83.4,
  "operational_mw": 146.0,
  "operational_homes_equivalent": 125000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.3,
  "rank": 78,
  "tech_mix": {
   "solar": 83.4
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.6,
  "projects": [
   {
    "site_name": "Warren Farm Solar Farm & Battery Storage",
    "repd_ref_id": 8494,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2022-03-15",
    "months_waiting": 52.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Partridge Hill Solar Farm",
    "repd_ref_id": 5460,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 33.0,
    "homes_equivalent": 12000,
    "consented": "2016-07-29",
    "months_waiting": 120.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Linroyal Potato Processing Plant, Heckdyke - Solar Panels",
    "repd_ref_id": 13094,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-02-23",
    "months_waiting": 41.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Tudworth Field Road, Hatfield - Solar Panels",
    "repd_ref_id": 11086,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-07-06",
    "months_waiting": 48.9,
    "status": "Under Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 39343,
  "seat_total_gbp": 3600000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 0.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 400.0,
  "sites": [
   {
    "site_name": "The Tween Bridge Solar Farm",
    "capacity_mw": 400.0,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 1402000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "The Tween Bridge Solar Farm",
   "repd_ref_id": 12926,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 800.0,
   "homes_equivalent": 290000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010148",
   "operator": "RWE",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "the Planning Inspectorate (it decides nationally significant projects)",
    "evidence": {
     "submitted": "2025-08-26",
     "months_waiting": 11
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "The Tween Bridge Solar Farm",
   "repd_ref_id": 19574,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010148",
   "operator": "RWE",
   "reason": {
    "reason": "connection_date",
    "label": "Cannot connect to the grid until 2029",
    "who": "the grid operator (NESO) and National Grid",
    "evidence": {
     "project": "Tween Bridge Solar Park",
     "connection_date": "2029-10-30",
     "mw": 800.0,
     "stage": 1.0,
     "source": "NESO TEC register"
    },
    "all_matches": [
     "connection_date",
     "in_planning"
    ]
   },
   "earliest": "2029",
   "tec": {
    "project": "Tween Bridge Solar Park",
    "connection_date": "2029-10-30",
    "connection_year": 2029,
    "mw": 800.0,
    "stage": 1.0,
    "who": "the grid operator (NESO) and National Grid",
    "gate2_outcome": null,
    "source": "NESO TEC register"
   }
  },
  {
   "site_name": "Warren Farm Solar Farm & Battery Storage",
   "repd_ref_id": 8494,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2022-03-15",
   "refused": null,
   "planning_authority": "Doncaster",
   "planning_ref": "21/02567/FULM",
   "operator": "Enso Green Holdings I Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-03-15",
     "years_since_consent": 4.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Pilfrey Solar Farm - Solar Farm",
   "repd_ref_id": 19542,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Lincolnshire",
   "planning_ref": "PA/2025/444",
   "operator": "Culham Renewables Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "North Lincolnshire Council",
    "evidence": {
     "submitted": "2025-08-06",
     "months_waiting": 12
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "North Moor Farm, Keadby - Solar Panels",
   "repd_ref_id": 19648,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "North Lincolnshire",
   "planning_ref": "PA/2025/445",
   "operator": "Lidsey Renewables Limited",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "North Lincolnshire Council",
    "evidence": {
     "submitted": "2025-08-21",
     "months_waiting": 11
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Partridge Hill Solar Farm",
   "repd_ref_id": 5460,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 33.0,
   "homes_equivalent": 12000,
   "status": "Awaiting Construction",
   "consented": "2016-07-29",
   "refused": null,
   "planning_authority": "Doncaster",
   "planning_ref": "15/01268/FULM",
   "operator": "Green Switch Solutions/Belvedere Energy Developments",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 10 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2016-07-29",
     "years_since_consent": 10.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001079",
  "E14001198",
  "E14001200",
  "E14001250"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}