 "pcon24cd": "E14001152",
 "name": "Carlisle",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 44.2,
   "sites": 2
  }
 },
 "number2": {
  "stuck_mw": 70.2,
  "stuck_mw_int": 70,
  "stuck_sites": 3,
  "homes_equivalent": 25000,
  "homes_vs_seat_households": 0.54,
  "stuck_mw_12m_cut": 70.2,
  "consented_not_built_mw_any_age": 70.6,
  "operational_mw": 49.2,
  "operational_homes_equivalent": 40000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.6,
  "rank": 96,
  "tech_mix": {
   "solar": 70.2
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 1.4,
  "projects": [
   {
    "site_name": "Leaps Rigg - Solar Farm",
    "repd_ref_id": 8526,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2023-09-28",
    "months_waiting": 34.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "High Parkfoot Farm",
    "repd_ref_id": 6588,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 20.0,
    "homes_equivalent": 7300,
    "consented": "2022-07-21",
    "months_waiting": 48.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Carleton Clinic, Cumwhinton Drive - Solar Panels",
    "repd_ref_id": 20516,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2026-04-13",
    "months_waiting": 3.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kingmoor Park Solar Farm Extension",
    "repd_ref_id": 8980,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-02-17",
    "months_waiting": 53.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Mercedes-Benz Of Carlisle, Spellar Way - Solar Panels",
    "repd_ref_id": 19924,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-12-22",
    "months_waiting": 7.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hespin Wood Materials Recovery Facility, Wavell Drive - Solar Panels",
    "repd_ref_id": 17346,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2024-11-21",
    "months_waiting": 20.4,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 47449,
  "seat_total_gbp": 4400000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 1378.5,
  "approved_24m_mw": 1018.5,
  "refused_mw": 340.0,
  "submitted_mw": 0.2,
  "sites": [
   {
    "site_name": "Blackdyke Farm, Blackford - Battery Storage",
    "capacity_mw": 400.0,
    "status": "approved",
    "year": 2023,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Low Harker Farm, Low Harker - Battery Storage Facility",
    "capacity_mw": 400.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 1402000
   },
   {
    "site_name": "Harker Moss - Battery Energy Storage System",
    "capacity_mw": 360.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 1261000
   },
   {
    "site_name": "Blackdyke Farm, Blackford - Battery Storage",
    "capacity_mw": 340.0,
    "status": "refused",
    "year": 2026,
    "homes_while_discharging": 1191000
   },
   {
    "site_name": "Todhills and Westlinton - Harker Battery Energy Storage Facility",
    "capacity_mw": 200.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Grassing Rome Street - Battery Storage",
    "capacity_mw": 15.5,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 54000
   },
   {
    "site_name": "Capon Tree Road - Battery Energy Storage",
    "capacity_mw": 3.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 11000
   },
   {
    "site_name": "Head Dale, Cocklakes - Micro Energy Storage Project",
    "capacity_mw": 0.2,
    "status": "submitted",
    "year": null,
    "homes_while_discharging": 700
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Blackdyke Farm, Blackford - Battery Storage",
   "repd_ref_id": 15005,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-10-05",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "23/0444",
   "operator": "Innova Renewables",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-10-05",
     "years_since_consent": 2.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Low Harker Farm, Low Harker - Battery Storage Facility",
   "repd_ref_id": 15956,
   "technology": "Battery",
   "capacity_mw": 400.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-07-18",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "24/0093",
   "operator": "Zenobe Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-07-18",
     "years_since_consent": 2.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Harker Moss - Battery Energy Storage System",
   "repd_ref_id": 17649,
   "technology": "Battery",
   "capacity_mw": 360.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-09",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "24/0680",
   "operator": "ESB (Harker) Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-09",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Blackdyke Farm, Blackford - Battery Storage",
   "repd_ref_id": 12710,
   "technology": "Battery",
   "capacity_mw": 340.0,
   "homes_equivalent": null,
   "status": "Application Refused",
   "consented": null,
   "refused": "2026-03-13",
   "planning_authority": "Cumberland",
   "planning_ref": "23/0659",
   "operator": "Novus Renewable Services Limited / Story Construction",
   "reason": {
    "reason": "refused",
    "label": "Refused by Cumberland Council in 2026",
    "who": "Cumberland Council",
    "evidence": {
     "refusal_date": "2026-03-13"
    },
    "all_matches": [
     "refused"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Todhills and Westlinton - Harker Battery Energy Storage Facility",
   "repd_ref_id": 15599,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-03-14",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "23/0833",
   "operator": "Windel Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-03-14",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Leaps Rigg - Solar Farm",
   "repd_ref_id": 8526,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2023-09-28",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "23/0415",
   "operator": "Opdenergy UK 7 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-09-28",
     "years_since_consent": 2.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "High Parkfoot Farm",
   "repd_ref_id": 6588,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 20.0,
   "homes_equivalent": 7300,
   "status": "Awaiting Construction",
   "consented": "2022-07-21",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "18/0197",
   "operator": "Elgin Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-07-21",
     "years_since_consent": 4.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Grassing Rome Street - Battery Storage",
   "repd_ref_id": 11611,
   "technology": "Battery",
   "capacity_mw": 15.5,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-03-07",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "22/0513",
   "operator": "STOR 141 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-03-07",
     "years_since_consent": 2.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Capon Tree Road - Battery Energy Storage",
   "repd_ref_id": 16377,
   "technology": "Battery",
   "capacity_mw": 3.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-06-19",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "24/0300",
   "operator": "Prime Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-06-19",
     "years_since_consent": 2.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Brampton Road, Longtown - Biomass Boilers",
   "repd_ref_id": 9354,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 1.8,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2021-08-31",
   "refused": null,
   "planning_authority": "Cumberland",
   "planning_ref": "21/0672",
   "operator": "Evenwood Products Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 5 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2021-08-31",
     "years_since_consent": 4.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001285",
  "E14001424",
  "S14000074",
  "S14000108"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}