 "pcon24cd": "E14001149",
 "name": "Cambridge",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 1.5,
  "stuck_mw_int": 1,
  "stuck_sites": 4,
  "homes_equivalent": 500,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 1.5,
  "consented_not_built_mw_any_age": 1.5,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.9,
  "rank": 378,
  "tech_mix": {
   "solar": 1.5
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "St Bedes Inter-Church School",
    "repd_ref_id": 7275,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2019-03-29",
    "months_waiting": 88.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lion Yard Shopping Centre, Lion Yard - Solar photovoltaic panels",
    "repd_ref_id": 14222,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-08-11",
    "months_waiting": 35.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "St Andrews Street - Roof mounted solar panels",
    "repd_ref_id": 10974,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2022-06-06",
    "months_waiting": 49.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cambridge Parkside Pool",
    "repd_ref_id": 9097,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2021-08-27",
    "months_waiting": 59.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kings College, West Road - Solar Photovoltaic panels",
    "repd_ref_id": 19730,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-12-17",
    "months_waiting": 7.5,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 44570,
  "seat_total_gbp": 4100000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "St Bedes Inter-Church School",
   "repd_ref_id": 7275,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.0,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2019-03-29",
   "refused": null,
   "planning_authority": "Cambridge",
   "planning_ref": "19/0136/C14P14",
   "operator": "Solar Options for Schools",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 7 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2019-03-29",
     "years_since_consent": 7.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001481",
  "E14001512",
  "E14001224"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}