 "pcon24cd": "E14001134",
 "name": "Bristol North West",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 34.9,
   "sites": 6
  }
 },
 "number2": {
  "stuck_mw": 5.6,
  "stuck_mw_int": 6,
  "stuck_sites": 4,
  "homes_equivalent": 2000,
  "homes_vs_seat_households": 0.05,
  "stuck_mw_12m_cut": 5.6,
  "consented_not_built_mw_any_age": 5.9,
  "operational_mw": 42.7,
  "operational_homes_equivalent": 33000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 1.7,
  "rank": 253,
  "tech_mix": {
   "solar": 5.6
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 0.1,
  "projects": [
   {
    "site_name": "Moorhouse Farm, Moorhouse Lane - Solar Park",
    "repd_ref_id": 13054,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 3.8,
    "homes_equivalent": 1400,
    "consented": "2024-04-30",
    "months_waiting": 27.1,
    "status": "Under Construction"
   },
   {
    "site_name": "Poplar Way East, Avonmouth - Solar Panels",
    "repd_ref_id": 16097,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2024-04-18",
    "months_waiting": 27.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Merebank Road - Solar photovoltaics equipment",
    "repd_ref_id": 9307,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2021-08-19",
    "months_waiting": 59.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "St Andrews Industrial Estate, Third Way - Solar PV Panels",
    "repd_ref_id": 16477,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-07-15",
    "months_waiting": 24.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Poplar Way East, Avonmouth - Solar Panels",
    "repd_ref_id": 19013,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2025-08-07",
    "months_waiting": 11.9,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 42608,
  "seat_total_gbp": 3900000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 32.0,
  "building_mw": 0.0,
  "approved_mw": 20.0,
  "approved_24m_mw": 0.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Severn Road",
    "capacity_mw": 32.0,
    "status": "operating",
    "year": 2018,
    "homes_while_discharging": 112000
   },
   {
    "site_name": "Kings Weston Lane - Battery Energy Storage System",
    "capacity_mw": 20.0,
    "status": "approved",
    "year": 2026,
    "homes_while_discharging": 70000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Kings Weston Lane - Battery Energy Storage System",
   "repd_ref_id": 17691,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-03-16",
   "refused": null,
   "planning_authority": "Bristol, City of",
   "planning_ref": "24/04429/F",
   "operator": "Fig Power",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-03-16",
     "years_since_consent": 0.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Moorhouse Farm, Moorhouse Lane - Solar Park",
   "repd_ref_id": 13054,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 3.8,
   "homes_equivalent": 1400,
   "status": "Under Construction",
   "consented": "2024-04-30",
   "refused": null,
   "planning_authority": "Bristol, City of",
   "planning_ref": "22/05849/F",
   "operator": "Cabot Park Solar Limited",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001399",
  "E14001131",
  "E14001133",
  "E14001237",
  "E14001545"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}