 "pcon24cd": "E14001105",
 "name": "Blackpool South",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 0.8,
  "stuck_mw_int": 1,
  "stuck_sites": 3,
  "homes_equivalent": 300,
  "homes_vs_seat_households": 0.01,
  "stuck_mw_12m_cut": 0.8,
  "consented_not_built_mw_any_age": 2.0,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.4,
  "median_months_to_decision": 1.6,
  "rank": 450,
  "tech_mix": {
   "solar": 0.8
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Tesco Stores, Clifton Retail Park -  Solar Panels",
    "repd_ref_id": 19883,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.7,
    "homes_equivalent": 300,
    "consented": "2025-12-03",
    "months_waiting": 8.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "St Georges School - Solar Panels",
    "repd_ref_id": 19860,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2025-12-03",
    "months_waiting": 8.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Blackpool Police Divisional Headquarters - Solar Panels",
    "repd_ref_id": 13776,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-06-05",
    "months_waiting": 37.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Marton Mere Holiday Village, Mythop Road - Solar Panels",
    "repd_ref_id": 13374,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-04-14",
    "months_waiting": 39.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Blackpool Victoria Hospital - Solar Panels",
    "repd_ref_id": 15856,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2024-03-12",
    "months_waiting": 28.7,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 49725,
  "seat_total_gbp": 4600000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001242",
  "E14001104"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}