 "pcon24cd": "E14001087",
 "name": "Beverley and Holderness",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 120.1,
   "sites": 11
  }
 },
 "number2": {
  "stuck_mw": 218.5,
  "stuck_mw_int": 218,
  "stuck_sites": 10,
  "homes_equivalent": 79000,
  "homes_vs_seat_households": 1.98,
  "stuck_mw_12m_cut": 318.3,
  "consented_not_built_mw_any_age": 726.8,
  "operational_mw": 125.1,
  "operational_homes_equivalent": 107000,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 3.3,
  "rank": 17,
  "tech_mix": {
   "solar": 218.5
  },
  "tech_summary": "all solar",
  "waiting_vs_running": 1.7,
  "projects": [
   {
    "site_name": "Peartree Hill Solar Farm",
    "repd_ref_id": 15000,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 320.0,
    "homes_equivalent": 116000,
    "consented": "2026-07-02",
    "months_waiting": 1.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Carr House Farm, Drove Lane - Solar Panels",
    "repd_ref_id": 14471,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2023-09-01",
    "months_waiting": 35.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Neat Marsh North, Neat Marsh Road -  Solar Farm",
    "repd_ref_id": 19431,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2026-02-27",
    "months_waiting": 5.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Turf Carr Solar Farm",
    "repd_ref_id": 11214,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2024-05-29",
    "months_waiting": 26.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Kenley Solar Farm",
    "repd_ref_id": 11367,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2022-11-18",
    "months_waiting": 44.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Carr Lane, Tickton - Solar Farm",
    "repd_ref_id": 11743,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2025-07-18",
    "months_waiting": 12.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage",
    "repd_ref_id": 13654,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 49.9,
    "homes_equivalent": 18000,
    "consented": "2024-11-11",
    "months_waiting": 20.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Field House Solar Farm",
    "repd_ref_id": 8995,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 40.0,
    "homes_equivalent": 15000,
    "consented": "2022-07-08",
    "months_waiting": 48.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Elstronwick, Burstwick - Daisy Hill Solar Photovoltaic Farm",
    "repd_ref_id": 16816,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 35.0,
    "homes_equivalent": 13000,
    "consented": "2026-01-30",
    "months_waiting": 6.1,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hull Solar Farm",
    "repd_ref_id": 5420,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 25.7,
    "homes_equivalent": 9300,
    "consented": "2015-10-15",
    "months_waiting": 129.6,
    "status": "Under Construction"
   },
   {
    "site_name": "Normandy Barracks",
    "repd_ref_id": 7818,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 2.3,
    "homes_equivalent": 800,
    "consented": null,
    "months_waiting": null,
    "status": "Under Construction"
   },
   {
    "site_name": "Bowmar Carr Road, Burton Pidsea - Solar Array",
    "repd_ref_id": 11490,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 1.0,
    "homes_equivalent": 400,
    "consented": "2022-10-27",
    "months_waiting": 45.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Church Hill Farm, Church Hill - Solar Array",
    "repd_ref_id": 15316,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.8,
    "homes_equivalent": 300,
    "consented": "2024-01-11",
    "months_waiting": 30.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Wingfield Way - Solar Panels",
    "repd_ref_id": 10628,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.6,
    "homes_equivalent": 200,
    "consented": "2022-03-29",
    "months_waiting": 52.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Grange Farm, Finchcroft Lane - Solar Panels",
    "repd_ref_id": 13772,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.4,
    "homes_equivalent": 100,
    "consented": "2023-06-13",
    "months_waiting": 37.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Withernsea High School, Hull Road - Solar Panels",
    "repd_ref_id": 19995,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2025-12-15",
    "months_waiting": 7.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Cold Harbour Farm, Cold Harbour Road - Solar PV Array",
    "repd_ref_id": 15808,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2024-04-16",
    "months_waiting": 27.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sand Le Mere Holiday Village, Southfield Lane - Solar Panels",
    "repd_ref_id": 20132,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2026-01-27",
    "months_waiting": 6.2,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Market Weighton Road, Middleton On The Wolds -Wind Turbine",
    "repd_ref_id": 19667,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2025-12-19",
    "months_waiting": 7.5,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Burton Road, Burton Pidsea - Wind Turbine",
    "repd_ref_id": 20380,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2026-03-26",
    "months_waiting": 4.3,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Priest Close, Burton Road - Wind Turbine",
    "repd_ref_id": 20454,
    "technology": "Wind Onshore",
    "capacity_mw": 0.2,
    "homes_equivalent": 200,
    "consented": "2026-03-27",
    "months_waiting": 4.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 40012,
  "seat_total_gbp": 3700000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0.0,
  "building_mw": 0.0,
  "approved_mw": 500.0,
  "approved_24m_mw": 40.0,
  "refused_mw": 0.0,
  "submitted_mw": 0.0,
  "sites": [
   {
    "site_name": "Staithes Road, Saltend -Battery Energy Storage System",
    "capacity_mw": 240.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 841000
   },
   {
    "site_name": "Kingston International Business Park - Battery Energy Storage System",
    "capacity_mw": 200.0,
    "status": "approved",
    "year": 2025,
    "homes_while_discharging": 701000
   },
   {
    "site_name": "Field House Solar Farm",
    "capacity_mw": 40.0,
    "status": "approved",
    "year": 2022,
    "homes_while_discharging": 140000
   },
   {
    "site_name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage",
    "capacity_mw": 20.0,
    "status": "approved",
    "year": 2024,
    "homes_while_discharging": 70000
   }
  ]
 },
 "pipeline_projects": [
  {
   "site_name": "Peartree Hill Solar Farm",
   "repd_ref_id": 15000,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 320.0,
   "homes_equivalent": 116000,
   "status": "Awaiting Construction",
   "consented": "2026-07-02",
   "refused": null,
   "planning_authority": "The Planning Inspectorate - National Infrastructure",
   "planning_ref": "EN010157",
   "operator": "JBM Solar / RWE",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-07-02",
     "years_since_consent": 0.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Staithes Road, Saltend -Battery Energy Storage System",
   "repd_ref_id": 17842,
   "technology": "Battery",
   "capacity_mw": 240.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-21",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/03387/STPLF",
   "operator": "SFEL One Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-21",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kingston International Business Park - Battery Energy Storage System",
   "repd_ref_id": 17424,
   "technology": "Battery",
   "capacity_mw": 200.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-07-02",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/02654/STPLF",
   "operator": "Story Contracting Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-02",
     "years_since_consent": 1.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "H2H, Saltend Chemicals Park, Saltend Lane - Humber Green Hydrogen Facility",
   "repd_ref_id": 14065,
   "technology": "Hydrogen",
   "capacity_mw": 100.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-06-07",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/00012/STOUT",
   "operator": "Meld Energy",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-06-07",
     "years_since_consent": 2.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Carr Lane, Tickton - Solar Farm",
   "repd_ref_id": 11743,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2025-07-18",
   "refused": "2024-12-06",
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/03648/STPLF",
   "operator": "Albanwise Synergy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-07-18",
     "years_since_consent": 1.0
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Carr House Farm, Drove Lane - Solar Panels",
   "repd_ref_id": 14471,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2023-09-01",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "23/01533/PLF",
   "operator": "Private Developer",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 3 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-09-01",
     "years_since_consent": 2.9
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Turf Carr Solar Farm",
   "repd_ref_id": 11214,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2024-05-29",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/02775/STPLF",
   "operator": "Anesco Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 2 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-05-29",
     "years_since_consent": 2.2
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kenley Solar Farm",
   "repd_ref_id": 11367,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2022-11-18",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/01208/STPLF",
   "operator": "Boom Power Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-11-18",
     "years_since_consent": 3.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Neat Marsh North, Neat Marsh Road -  Solar Farm",
   "repd_ref_id": 19431,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2026-02-27",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "25/01811/STPLF",
   "operator": "Neat Marsh Solar Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-02-27",
     "years_since_consent": 0.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage",
   "repd_ref_id": 13654,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Awaiting Construction",
   "consented": "2024-11-11",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "23/00760/STPLFE",
   "operator": "GAM Capital Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-11",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Kenley House Farm, Ferry Road - Solar Farm",
   "repd_ref_id": 13832,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 49.9,
   "homes_equivalent": 18000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "25/02275/STPLF",
   "operator": "Lighthouse Development Consulting",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "East Riding of Yorkshire Council",
    "evidence": {
     "submitted": "2025-08-21",
     "months_waiting": 11
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Harbour Farm - Solar Farm",
   "repd_ref_id": 11386,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 42.0,
   "homes_equivalent": 15000,
   "status": "Application Submitted",
   "consented": null,
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "25/02255/STPLFE",
   "operator": "Grupotec",
   "reason": {
    "reason": "in_planning",
    "label": "Applied in 2025, still waiting for a decision",
    "who": "East Riding of Yorkshire Council",
    "evidence": {
     "submitted": "2025-09-17",
     "months_waiting": 11
    },
    "all_matches": [
     "in_planning"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Field House Solar Farm",
   "repd_ref_id": 8995,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 40.0,
   "homes_equivalent": 15000,
   "status": "Awaiting Construction",
   "consented": "2022-07-08",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/00824/STPLF",
   "operator": "Albanwise Synergy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-07-08",
     "years_since_consent": 4.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Field House Solar Farm",
   "repd_ref_id": 10970,
   "technology": "Battery",
   "capacity_mw": 40.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2022-07-08",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/00824/STPLF",
   "operator": "Albanwise Synergy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-07-08",
     "years_since_consent": 4.1
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Elstronwick, Burstwick - Daisy Hill Solar Photovoltaic Farm",
   "repd_ref_id": 16816,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 35.0,
   "homes_equivalent": 13000,
   "status": "Awaiting Construction",
   "consented": "2026-01-30",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/01484/STPLF",
   "operator": "Enviromena Project Management UK Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-01-30",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Aldbrough Hydrogen Pathfinder -  Electrolytic Hydrogen Facility",
   "repd_ref_id": 17448,
   "technology": "Hydrogen",
   "capacity_mw": 35.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2025-04-25",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "24/02391/STPLFE",
   "operator": "SSE Enterprise Contracting",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2025-04-25",
     "years_since_consent": 1.3
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Hull Solar Farm",
   "repd_ref_id": 5420,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 25.7,
   "homes_equivalent": 9300,
   "status": "Under Construction",
   "consented": "2015-10-15",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "15/01752/STPLF",
   "operator": "Gridserve",
   "reason": {
    "reason": "building",
    "label": "Under construction",
    "who": "the developer",
    "evidence": {},
    "all_matches": [
     "building"
    ]
   },
   "earliest": "2027 (in construction)",
   "tec": null
  },
  {
   "site_name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage",
   "repd_ref_id": 13655,
   "technology": "Battery",
   "capacity_mw": 20.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2024-11-11",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "23/00760/STPLFE",
   "operator": "GAM Capital Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2024-11-11",
     "years_since_consent": 1.7
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Ottringham Road, Keyingham - Anaerobic Digestion Facility",
   "repd_ref_id": 19497,
   "technology": "Anaerobic Digestion",
   "capacity_mw": 7.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2026-03-27",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "25/01662/CM",
   "operator": "Saltaugh Grange Renewable Energy Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-03-27",
     "years_since_consent": 0.4
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Raventhorpe Nursery, Rootas Lane - Biomass Boiler",
   "repd_ref_id": 13306,
   "technology": "Biomass (dedicated)",
   "capacity_mw": 2.0,
   "homes_equivalent": null,
   "status": "Awaiting Construction",
   "consented": "2023-01-18",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/03713/PLF",
   "operator": "Raventhorpe Nursery Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2023-01-18",
     "years_since_consent": 3.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  },
  {
   "site_name": "Bowmar Carr Road, Burton Pidsea - Solar Array",
   "repd_ref_id": 11490,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 1.0,
   "homes_equivalent": 400,
   "status": "Awaiting Construction",
   "consented": "2022-10-27",
   "refused": null,
   "planning_authority": "East Riding of Yorkshire",
   "planning_ref": "22/01199/PLF",
   "operator": "BeBa Energy UK Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved 4 years ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2022-10-27",
     "years_since_consent": 3.8
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 1,
 "neighbours": [
  "E14001313",
  "E14001314",
  "E14001127",
  "E14001250"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}