{
 "pcon24cd": "E14001078",
 "name": "Basingstoke",
 "nation": "England",
 "number1": {
  "visible": false,
  "note": "No big wind farm on the national grid is mapped to this constituency. Smaller wind farms here can still be paid to switch off by the local network, but those payments are not visible in national data \u2014 the \u00a3 figure is a floor.",
  "invisible_wind": {
   "mw": 0.0,
   "sites": 0
  }
 },
 "number2": {
  "stuck_mw": 2.1,
  "stuck_mw_int": 2,
  "stuck_sites": 7,
  "homes_equivalent": 800,
  "homes_vs_seat_households": 0.02,
  "stuck_mw_12m_cut": 2.1,
  "consented_not_built_mw_any_age": 32.1,
  "operational_mw": 0.0,
  "operational_homes_equivalent": 0,
  "refused_5y_mw": 0.0,
  "withdrawn_5y_mw": 0.0,
  "median_months_to_decision": 2.2,
  "rank": 338,
  "tech_mix": {
   "solar": 2.1
  },
  "tech_summary": "all solar",
  "waiting_vs_running": null,
  "projects": [
   {
    "site_name": "Hook Lane, Malshanger",
    "repd_ref_id": 7962,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 30.0,
    "homes_equivalent": 11000,
    "consented": "2026-02-13",
    "months_waiting": 5.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Sainsburys, Wallop Drive- Solar Panels",
    "repd_ref_id": 14971,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.6,
    "homes_equivalent": 200,
    "consented": "2023-11-20",
    "months_waiting": 32.4,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Worting Road - Solar Array",
    "repd_ref_id": 10357,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.5,
    "homes_equivalent": 200,
    "consented": "2022-02-03",
    "months_waiting": 53.9,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Gemini Centre, Hamilton Close - Solar Panels",
    "repd_ref_id": 13628,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.3,
    "homes_equivalent": 100,
    "consented": "2023-05-16",
    "months_waiting": 38.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Hollywood Bowl, Basingstoke Leisure Park - Solar Panel Photovoltaics",
    "repd_ref_id": 11368,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2022-07-11",
    "months_waiting": 48.8,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Pinewood, Crockford Lane - Solar Panels",
    "repd_ref_id": 15603,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2024-02-15",
    "months_waiting": 29.6,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Worting Road - Solar Panels",
    "repd_ref_id": 9759,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.2,
    "homes_equivalent": 100,
    "consented": "2021-11-03",
    "months_waiting": 57.0,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Inchcape Estates, Edison Road - Solar Panels",
    "repd_ref_id": 14226,
    "technology": "Solar Photovoltaics",
    "capacity_mw": 0.1,
    "homes_equivalent": 100,
    "consented": "2023-07-13",
    "months_waiting": 36.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "Lime Tree Way, Crockford Lane - Solar Panels",
    "repd_ref_id": 18970,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-12-11",
    "months_waiting": 7.7,
    "status": "Awaiting Construction"
   },
   {
    "site_name": "The Costello School - Solar PV Array",
    "repd_ref_id": 19235,
    "technology": "Solar Photovoltaics",
    "capacity_mw": null,
    "homes_equivalent": null,
    "consented": "2025-10-27",
    "months_waiting": 9.2,
    "status": "Awaiting Construction"
   }
  ]
 },
 "number3": {
  "applicable": true,
  "per_household_gbp": 91.96,
  "seat_households": 45583,
  "seat_total_gbp": 4200000,
  "framings": {
   "days_of_home_electricity": 51.0
  },
  "note": "National figure: the per-household cost is the same for every GB seat; only the seat total varies with household count."
 },
 "batteries": {
  "operating_mw": 0,
  "building_mw": 0,
  "approved_mw": 0,
  "approved_24m_mw": 0,
  "refused_mw": 0,
  "submitted_mw": 0,
  "sites": []
 },
 "pipeline_projects": [
  {
   "site_name": "Hook Lane, Malshanger",
   "repd_ref_id": 7962,
   "technology": "Solar Photovoltaics",
   "capacity_mw": 30.0,
   "homes_equivalent": 11000,
   "status": "Awaiting Construction",
   "consented": "2026-02-13",
   "refused": null,
   "planning_authority": "Basingstoke and Deane",
   "planning_ref": "23/03012/FUL",
   "operator": "Nextpower SPV 18 Limited",
   "reason": {
    "reason": "consented_no_activity",
    "label": "Approved less than a year ago \u2014 nothing has happened since",
    "who": "the developer and the network company",
    "evidence": {
     "consent_date": "2026-02-13",
     "years_since_consent": 0.5
    },
    "all_matches": [
     "consented_no_activity"
    ]
   },
   "earliest": null,
   "tec": null
  }
 ],
 "projects_withheld_unreferenced": 0,
 "neighbours": [
  "E14001587",
  "E14001214",
  "E14001403",
  "E14001392"
 ],
 "flags": [
  "curtailment_not_visible"
 ],
 "windows": {
  "curtailment": [
   "2025-08-01",
   "2026-07-31"
  ],
  "repd_as_of": "2026-08-03"
 }
}